ITAC Assessment: DL0085
ITAC logo
ITAC Assessment: DL0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product capital equipment fo the corrugated box industry
NAICS 333243: Sawmill, Woodworking, and Paper Machinery Manufacturing
SIC 3554: Paper Industries Machinery
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 200,000
ft2
Annual Production 9,999,999,999
units
Production Hrs. Annual 7,488
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $752,528 6,046,950
kWh
Natural Gas $122,814 9,681
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $161,388 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7262: Separate controls of air handlers from ac/ heating systems $37,175 $100 $37,175
299,800
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $7,948 $100 - $7,948
-
MMBtu
03 2.2437: Recover waste heat from equipment $9,212 $6,080 - $9,212
-
MMBtu
04 2.7241: Install outside air damper / economizer on hvac unit $25,500 $21,080 $25,500
205,500
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $32,910 $51,500 $32,910
265,430
kWh
-
06 2.2437: Recover waste heat from equipment $7,995 $4,850 - $7,995
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,020 $2,800 $4,020
32,400
kWh
-
08 2.7135: Install occupancy sensors $2,640 $620 $2,640
21,340
kWh
-
09 2.2414: Use waste heat from hot flue gases to preheat $23,794 $80,000 - $23,794
-
MMBtu
10 2.7244: Revise smoke cleanup from operations $3,290 $11,200 $3,290
26,500
kWh
-
11 2.7243: Improve air circulation with destratification fans / other methods $5,894 $11,040 $(-1,860.0)
(-15,000)
kWh
$7,754
-
MMBtu
12 2.6218: Turn off equipment when not in use $1,010 $500 $1,010
8,150
kWh
-
TOTAL RECOMMENDED $161,388 $189,870 $104,685
844,120
kWh
$56,703
-
MMBtu
TOTAL IMPLEMENTED $93,515 $98,230 $68,360
551,170
kWh
$25,155
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs