ITAC Assessment: HO0192
ITAC logo
ITAC Assessment: HO0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Primary Lithium Batteries
NAICS
n/a
SIC 3692: Primary Batteries, Dry and Wet
Sales Range $10
M
to 50
M
# of Employees 410
Plant Area 43,000
ft2
Annual Production 6,750,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,313 1,128,957
kWh
Electricity Demand $28,024 4,038
kW-mo/yr
Electricity Fees $41,474 -
Natural Gas $44,952 9,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,014

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,539 $8,289 $2,758
56,272
kWh
$781
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $409 $1,120 $409
8,499
kWh
- - - - -
03 2.7231: Use radiant heater for spot heating $2,678 $4,800 - - $2,678
-
MMBtu
- - -
04 2.2511: Insulate bare equipment $2,083 $520 - - $2,083
-
MMBtu
- - -
05 2.7495: Install replacement doors $562 $700 - - $562
-
MMBtu
- - -
06 4.652: Replace existing equipment with more suitable substitutes $960 $600 - - - - - $960
07 4.111: Add equipment/ operators to reduce production bottleneck $6,000 $5,000 - - - - - $6,000
08 3.5248: Separate and recycle scrap metal to foundry or for sale $1,200 $1,000 - - - $1,200
-
lb
- -
09 3.5217: Reuse / recycle/ sell paper products $2,400 $1,000 - - - $2,400
-
lb
- -
10 3.1191: Change procedures / equipment / operating conditions $5,000 $1,000 - - - - $5,000
-
lb
-
TOTAL RECOMMENDED $24,831 $24,029 $3,167
64,771
kWh
$781
-
kW-mo/yr
$5,323
-
MMBtu
$3,600
-
lb
$5,000
-
lb
$6,960
TOTAL IMPLEMENTED $9,014 $3,940 $409
8,499
kWh
- $2,645
-
MMBtu
- $5,000
-
lb
$960
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs