ITAC Assessment: NV0020
ITAC logo
ITAC Assessment: NV0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Concrete Pipes
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 17
Plant Area 18,400
ft2
Annual Production 35,000
ton
Production Hrs. Annual 2,730
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,630 372,509
kWh
Natural Gas $18,782 3,620
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,759 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,219

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,565 $1,264 $1,565
16,413
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $183 $76 $183
2,052
kWh
-
03 2.7261: Install timers and/or thermostats $972 $320 - $972
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $166 $44 - $166
-
MMBtu
05 2.2511: Insulate bare equipment $1,416 $220 - $1,416
-
MMBtu
06 2.2511: Insulate bare equipment $2,224 $3,088 - $2,224
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,665 $200 $1,665
17,585
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $568 $180 $568
5,862
kWh
-
TOTAL RECOMMENDED $8,759 $5,392 $3,981
41,912
kWh
$4,778
-
MMBtu
TOTAL IMPLEMENTED $4,219 $784 $1,665
17,585
kWh
$2,554
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs