| Assessment Year | 2007 |
|---|---|
| Principal Product | Structural Assembly |
| NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
96,000
ft2
|
| Annual Production | 23,989,513
pieces
|
| Production Hrs. Annual | 3,920
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $130,770 | 3,029,106 |
kWh
|
$0.043 |
| Electricity Demand | $32,776 | 7,476 |
kW-mo/yr
|
$4.38 |
| Electricity Fees | $90,701 | - |
|
- |
| Natural Gas | $42,706 | 3,430 |
MMBtu
|
$12.45 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,439 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,069 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,119 | $27,463 |
$14,566
333,190
kWh
|
$3,538
-
kW-mo/yr
|
$15 | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $2,525 | $337 |
$2,068
47,304
kWh
|
$455
-
kW-mo/yr
|
$2 | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,069 | $153 |
$2,068
47,304
kWh
|
- | $1 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $959 | $18,627 |
$681
15,584
kWh
|
$277
-
kW-mo/yr
|
$1 | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $767 | $1,950 |
$584
13,357
kWh
|
$182
-
kW-mo/yr
|
$1 | |
| TOTAL RECOMMENDED | $24,439 | $48,530 |
$19,967
456,739
kWh
|
$4,452
-
kW-mo/yr
|
$20 | ||
| TOTAL IMPLEMENTED | $2,069 | $153 |
$2,068
47,304
kWh
|
- | $1 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs