ITAC Assessment: MS0315
ITAC logo
ITAC Assessment: MS0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Structural Assembly
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 96,000
ft2
Annual Production 23,989,513
pieces
Production Hrs. Annual 3,920
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,770 3,029,106
kWh
Electricity Demand $32,776 7,476
kW-mo/yr
Electricity Fees $90,701 -
Natural Gas $42,706 3,430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,069

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,119 $27,463 $14,566
333,190
kWh
$3,538
-
kW-mo/yr
$15
02 2.7111: Reduce illumination to minimum necessary levels $2,525 $337 $2,068
47,304
kWh
$455
-
kW-mo/yr
$2
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,069 $153 $2,068
47,304
kWh
- $1
04 2.7142: Utilize higher efficiency lamps and/or ballasts $959 $18,627 $681
15,584
kWh
$277
-
kW-mo/yr
$1
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $767 $1,950 $584
13,357
kWh
$182
-
kW-mo/yr
$1
TOTAL RECOMMENDED $24,439 $48,530 $19,967
456,739
kWh
$4,452
-
kW-mo/yr
$20
TOTAL IMPLEMENTED $2,069 $153 $2,068
47,304
kWh
- $1
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs