ITAC Assessment: TN0522
ITAC logo
ITAC Assessment: TN0522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Carpet cushion underlay
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 24,000,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,498 2,077,081
kWh
Natural Gas $9,973 1,302
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,071 $995 - $2,071
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,352 $2,470 $4,352
75,029
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,924 $600 $2,924
50,410
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,210 $620 $2,210
38,101
kWh
-
05 2.7261: Install timers and/or thermostats $1,615 $1,100 $1,615
27,843
kWh
-
06 2.4314: Use synthetic lubricant $1,462 - $1,462
25,205
kWh
-
TOTAL RECOMMENDED $14,634 $5,785 $12,563
216,588
kWh
$2,071
-
MMBtu
TOTAL IMPLEMENTED $12,424 $5,165 $10,353
178,487
kWh
$2,071
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs