ITAC Assessment: TN0513
ITAC logo
ITAC Assessment: TN0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Electric relays and solenoids
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 65,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,875
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,531 2,050,117
kWh
Fuel Oil #2 $7,065 1,939
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,497

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7261: Install timers and/or thermostats $7,632 $3,500 $6,321
98,769
kWh
$1,311
-
MMBtu
02 2.2153: Close off unneeded steam lines $1,428 - - $1,428
-
MMBtu
03 2.6218: Turn off equipment when not in use $3,733 - $3,733
58,324
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $3,076 $3,350 $3,076
48,066
kWh
-
05 2.2511: Insulate bare equipment $168 $95 - $168
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $638 $480 $638
9,965
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $431 $1,300 $431
6,741
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $338 $570 $338
5,275
kWh
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $319 $120 $319
4,982
kWh
-
10 2.6218: Turn off equipment when not in use $263 - $263
4,103
kWh
-
11 2.4221: Install compressor air intakes in coolest locations $169 $470 $169
2,638
kWh
-
TOTAL RECOMMENDED $18,195 $9,885 $15,288
238,863
kWh
$2,907
-
MMBtu
TOTAL IMPLEMENTED $2,497 $575 $901
14,068
kWh
$1,596
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs