ITAC Assessment: MAS024
ITAC logo
ITAC Assessment: MAS024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Syntatic Foam and Tape
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 80,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,720 2,196,640
kWh
Electricity Demand $80,358 6,229
kW-mo/yr
Natural Gas $35,598 12,456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,798 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,311

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $19,562 $150 - - $19,562 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,698 $59,484 $12,750
110,484
kWh
$1,948
-
kW-mo/yr
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $5,802 $22,500 $12,154
105,312
kWh
- - $(-6,352.0)
-
MMBtu
04 2.2511: Insulate bare equipment $4,676 $2,250 $4,676
40,523
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,749 - $1,820
15,768
kWh
$929
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $1,070 $1,700 - - - $1,070
-
MMBtu
07 2.2511: Insulate bare equipment $241 $345 - - - $241
-
MMBtu
TOTAL RECOMMENDED $48,798 $86,429 $31,400
272,087
kWh
$2,877
-
kW-mo/yr
$19,562 $(-5,041.0)
-
MMBtu
TOTAL IMPLEMENTED $22,311 $150 $1,820
15,768
kWh
$929
-
kW-mo/yr
$19,562 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs