Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product INDUSTRIAL FANS
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area
n/a
Annual Production 117,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,898 1,199,883
kWh
Natural Gas $26,213 4,604
MMBtu
Other Energy $11,979 3,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings
01 2.2136: Install / repair insulation on steam lines $6,520 $4,200 - $6,520
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $1,478 $500 $1,680
29,308
kWh
$(-202.0)
-
MMBtu
03 2.7492: Use proper thickness of insulation on building envelope $698 $1,436 - $698
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $823 - $823
-
kWh
-
05 2.2136: Install / repair insulation on steam lines $130 $100 - $130
-
MMBtu
TOTAL RECOMMENDED $9,649 $6,236 $2,503
29,308
kWh
$7,146
-
MMBtu
TOTAL IMPLEMENTED $2,999 $1,936 $2,503
29,308
kWh
$496
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs