| Assessment Year | 1984 |
|---|---|
| Principal Product | INDUSTRIAL FANS |
| NAICS |
n/a
|
| SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 121 |
| Plant Area |
n/a
|
| Annual Production | 117,000
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $65,898 | 1,199,883 |
kWh
|
$0.055 |
| Natural Gas | $26,213 | 4,604 |
MMBtu
|
$5.69 |
| Other Energy | $11,979 | 3,180 |
MMBtu
|
$3.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,649 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,999 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Energy Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $6,520 | $4,200 | - |
$6,520
-
MMBtu
|
|
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $1,478 | $500 |
$1,680
29,308
kWh
|
$(-202.0)
-
MMBtu
|
|
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $698 | $1,436 | - |
$698
-
MMBtu
|
|
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $823 | - |
$823
-
kWh
|
- | |
| 05 | 2.2136: Install / repair insulation on steam lines | $130 | $100 | - |
$130
-
MMBtu
|
|
| TOTAL RECOMMENDED | $9,649 | $6,236 |
$2,503
29,308
kWh
|
$7,146
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,999 | $1,936 |
$2,503
29,308
kWh
|
$496
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs