ITAC Assessment: SU0141
ITAC logo
ITAC Assessment: SU0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Rebar Steel
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $100
M
to 500
M
# of Employees 285
Plant Area 386,590
ft2
Annual Production 400,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,200,965 120,016,084
kWh
Electricity Demand $3,846,335 543,264
kW-mo/yr
Natural Gas $4,663,245 769,657
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,057,014 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $820,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings By-product Production Savings
01 2.8114: Change rate schedules or other changes in utility service $4,663,245 $4,336,000 - - $4,663,245
-
MMBtu
- - -
02 2.1221: Replace obsolete burners with more efficient ones $640,000 $9,000,000 - - $640,000
-
MMBtu
- - -
03 2.8211: Consolidate freight shipments and/or deliveries $522,000 $4,077,000 - - - - $300,000 $222,000
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $117,834 $95,000 $77,230
1,544,600
kWh
- - $40,604
-
Tgal
- -
05 2.4133: Use most efficient type of electric motors $55,317 $203,719 $55,317
1,106,340
kWh
- - - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $33,774 - $33,774
644,491
kWh
- - - - -
07 2.3212: Optimize plant power factor $17,677 $84,000 - $17,677 - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,012 $480 $5,012
100,240
kWh
- - - - -
09 2.7135: Install occupancy sensors $2,155 $1,110 $2,155
43,100
kWh
- - - - -
TOTAL RECOMMENDED $6,057,014 $17,797,309 $173,488
3,438,771
kWh
$17,677 $5,303,245
-
MMBtu
$40,604
-
Tgal
$300,000 $222,000
TOTAL IMPLEMENTED $820,318 $9,300,309 $139,714
2,794,280
kWh
- $640,000
-
MMBtu
$40,604
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs