ITAC Assessment: IP0071
ITAC logo
ITAC Assessment: IP0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Hot Mix Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 42,800
ft2
Annual Production 84,000
units
Production Hrs. Annual 1,980
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,604 336,181
kWh
Electricity Demand $24,377 3,125
kW-mo/yr
Electricity Fees $1,757 -
Natural Gas $126,878 25,778
MMBtu
TOTAL YEARLY COSTS $179,616
RECOMMENDED SAVINGS* $11,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,630 $1,030 $1,630
20,770
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,868 $5,332 $6,868
87,516
kWh
- -
03 2.2511: Insulate bare equipment $2,687 $2,183 - - $2,687
-
MMBtu
04 2.7135: Install occupancy sensors $106 $136 $106
1,345
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $705 $2,374 $440
5,617
kWh
$265
-
kW-mo/yr
-
TOTAL RECOMMENDED $11,996 $11,055 $9,044
115,248
kWh
$265
-
kW-mo/yr
$2,687
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs