| Assessment Year | 1993 |
|---|---|
| Principal Product | Blown glass bulbs |
| NAICS |
n/a
|
| SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 166 |
| Plant Area |
215,000
ft2
|
| Annual Production | 4,300,000,000
pieces
|
| Production Hrs. Annual | 8,232
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $838,345 | 28,548,066 |
kWh
|
$0.029 |
| Natural Gas | $1,942,983 | 689,600 |
MMBtu
|
$2.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $168,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,118 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $153,224 | $275,000 |
$39,880
1,375,147
kWh
|
$113,344
-
MMBtu
|
|
| 02 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $3,057 | - |
$790
27,257
kWh
|
$2,267
-
MMBtu
|
|
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,105 | $1,254 |
$4,105
141,559
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $4,000 | $820 |
$4,000
138,042
kWh
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $1,353 | $4,000 |
$348
12,016
kWh
|
$1,005
-
MMBtu
|
|
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $2,150 | - |
$2,150
74,150
kWh
|
- | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $603 | - |
$603
20,809
kWh
|
- | |
| TOTAL RECOMMENDED | $168,492 | $281,074 |
$51,876
1,788,980
kWh
|
$116,616
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $13,118 | $6,074 |
$9,846
339,683
kWh
|
$3,272
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs