ITAC Assessment: TN0494
ITAC logo
ITAC Assessment: TN0494
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product children's clothing, shorts and pant
NAICS
n/a
SIC 2361: Girls', Children's, and Infants' Dresses, Blouses, and Shirts
Sales Range $1
M
to 5
M
# of Employees 255
Plant Area 42,421
ft2
Annual Production 3,720,000
pieces
Production Hrs. Annual 2,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,894 1,194,021
kWh
Natural Gas $465 67
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7144: Install spectral reflectors / delamp $7,383 $26,368 $7,383
130,422
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $5,037 - $5,037
98,769
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $957 $1,710 $957
18,757
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $643 $406 $643
12,603
kWh
-
05 2.7261: Install timers and/or thermostats $338 $840 $90
1,758
kWh
$248
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $463 $1,686 $463
9,086
kWh
-
07 2.6218: Turn off equipment when not in use $314 - $314
6,155
kWh
-
TOTAL RECOMMENDED $15,135 $31,010 $14,887
277,550
kWh
$248
-
MMBtu
TOTAL IMPLEMENTED $15,135 $31,010 $14,887
277,550
kWh
$248
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs