Assessment Year | 2024 |
---|---|
Principal Product | Metal Cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $50 M to 100M |
# of Employees | 65 |
Plant Area |
218,000
ft2
|
Annual Production | 450,000,000
pieces
|
Production Hrs. Annual | 6,624
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,084,379 | 9,445,657 |
kWh
|
$0.11 |
Electricity Demand | $189,262 | 27,758 |
kW-mo/yr
|
$6.82 |
Electricity Fees | $87,514 | - |
|
- |
Natural Gas | $512,201 | 36,036 |
MMBtu
|
$14.21 |
TOTAL YEARLY COSTS | $1,873,356 | |||
RECOMMENDED SAVINGS* | $73,636 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,659 | - |
$7,299
58,821
kWh
|
- | $(-640.0) | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,433 | $730 |
$2,433
19,608
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,097 | $12,467 |
$11,691
94,207
kWh
|
$1,164
-
kW-mo/yr
|
$(-1,197.0) | $439 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,663 | $34,431 |
$10,663
85,919
kWh
|
- | - | - | |
05 | 2.2425: Use flue gases to heat process or service water | $28,508 | $135,731 |
$28,508
229,720
kWh
|
- | - | - | |
06 | 2.7233: Use properly designed and sized hvac equipment | $13,276 | $95,533 |
$13,276
106,980
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $73,636 | $278,892 |
$73,870
595,255
kWh
|
$1,164
-
kW-mo/yr
|
$(-1,837.0) | $439 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs