ITAC Assessment: TN0491
ITAC logo
ITAC Assessment: TN0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Metallic wind tunnel test models
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 55,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,298 2,006,155
kWh
Natural Gas $1,231 111
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,236 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $4,084 $3,680 $4,084
80,598
kWh
02 2.7261: Install timers and/or thermostats $1,810 $2,260 $1,810
36,928
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $991 $320 $991
20,223
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $488 - $488
9,965
kWh
05 2.7111: Reduce illumination to minimum necessary levels $504 $320 $504
9,672
kWh
06 2.6212: Turn off equipment during breaks, reduce operating time $201 $560 $201
4,103
kWh
07 2.4221: Install compressor air intakes in coolest locations $158 $520 $158
3,224
kWh
TOTAL RECOMMENDED $8,236 $7,660 $8,236
164,713
kWh
TOTAL IMPLEMENTED $3,305 $2,900 $3,305
66,823
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs