| Assessment Year | 1993 |
|---|---|
| Principal Product | Metallic wind tunnel test models |
| NAICS |
n/a
|
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
55,000
ft2
|
| Annual Production | 50
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $98,298 | 2,006,155 |
kWh
|
$0.049 |
| Natural Gas | $1,231 | 111 |
MMBtu
|
$11.09 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,236 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,305 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $4,084 | $3,680 |
$4,084
80,598
kWh
|
|
| 02 | 2.7261: Install timers and/or thermostats | $1,810 | $2,260 |
$1,810
36,928
kWh
|
|
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $991 | $320 |
$991
20,223
kWh
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $488 | - |
$488
9,965
kWh
|
|
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $504 | $320 |
$504
9,672
kWh
|
|
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $201 | $560 |
$201
4,103
kWh
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $158 | $520 |
$158
3,224
kWh
|
|
| TOTAL RECOMMENDED | $8,236 | $7,660 |
$8,236
164,713
kWh
|
||
| TOTAL IMPLEMENTED | $3,305 | $2,900 |
$3,305
66,823
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs