Assessment Year | 1993 |
---|---|
Principal Product | aluminum and zinc die castings |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
47,000
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 7,800
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $388,024 | 8,083,822 |
kWh
|
$0.048 |
Natural Gas | $99,157 | 18,709 |
MMBtu
|
$5.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,158 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,530 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $8,220 | $1,081 | - |
$8,220
-
MMBtu
|
|
02 | 2.2522: Isolate hot or cold equipment | $2,687 | $7,200 |
$2,687
55,979
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,097 | $490 |
$1,097
22,860
kWh
|
- | |
04 | 2.7261: Install timers and/or thermostats | $746 | $460 |
$746
15,533
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $408 | $277 |
$408
8,499
kWh
|
- | |
TOTAL RECOMMENDED | $13,158 | $9,508 |
$4,938
102,871
kWh
|
$8,220
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,530 | $8,150 |
$4,530
94,372
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs