ITAC Assessment: TN0484
ITAC logo
ITAC Assessment: TN0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Iron castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 46,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 3,120
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,372 1,006,741
kWh
Natural Gas $13,993 2,294
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,692 - n/a $2,692
48,066
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,559 $413 n/a $1,559
27,843
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $482 $620 n/a - $482
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $263 $490 n/a $263
4,689
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $99 $124 n/a $99
1,758
kWh
-
TOTAL RECOMMENDED $5,095 $1,647 $4,613
82,356
kWh
$482
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs