ITAC Assessment: UD0148
ITAC logo
ITAC Assessment: UD0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product VEGETABLE OIL PRESSES
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 184
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,555 2,225,088
kWh
Natural Gas $64,969 11,860
MMBtu
Fuel Oil #6 $14,514 3,496
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,611

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,500 $300 $4,500
-
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,111 $2,395 $5,321
78,253
kWh
$(-1,210.0)
-
MMBtu
03 2.2511: Insulate bare equipment $994 $1,560 - $994
-
MMBtu
TOTAL RECOMMENDED $9,605 $4,255 $9,821
78,253
kWh
$(-216.0)
-
MMBtu
TOTAL IMPLEMENTED $8,611 $2,695 $9,821
78,253
kWh
$(-1,210.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs