Assessment Year | 1992 |
---|---|
Principal Product | PLASTIC PARTS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 420 |
Plant Area |
n/a
|
Annual Production | 11,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $897,366 | 18,084,701 |
kWh
|
$0.050 |
Natural Gas | $47,554 | 7,672 |
MMBtu
|
$6.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $109,121 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $77,374 | $825 |
$77,374
1,547,480
kWh
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $766 | $3,150 |
$766
15,240
kWh
|
- | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,509 | $2,980 | - |
$3,509
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $6,052 | $9,972 |
$6,052
121,043
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,554 | $3,200 |
$5,554
111,079
kWh
|
- | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $8,546 | $120 |
$5,246
104,924
kWh
|
- | $3,300 | |
07 | 2.2511: Insulate bare equipment | $5,232 | $903 |
$5,232
104,631
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,088 | $608 |
$2,696
53,927
kWh
|
- | $(-608.0) | |
TOTAL RECOMMENDED | $109,121 | $21,758 |
$102,920
2,058,324
kWh
|
$3,509
-
MMBtu
|
$2,692 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs