ITAC Assessment: TN0473
ITAC logo
ITAC Assessment: TN0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 420
Plant Area
n/a
Annual Production 11,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $897,366 18,084,701
kWh
Natural Gas $47,554 7,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,121 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $77,374 $825 $77,374
1,547,480
kWh
- -
02 2.7261: Install timers and/or thermostats $766 $3,150 $766
15,240
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $3,509 $2,980 - $3,509
-
MMBtu
-
04 2.2511: Insulate bare equipment $6,052 $9,972 $6,052
121,043
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,554 $3,200 $5,554
111,079
kWh
- -
06 2.7111: Reduce illumination to minimum necessary levels $8,546 $120 $5,246
104,924
kWh
- $3,300
07 2.2511: Insulate bare equipment $5,232 $903 $5,232
104,631
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,088 $608 $2,696
53,927
kWh
- $(-608.0)
TOTAL RECOMMENDED $109,121 $21,758 $102,920
2,058,324
kWh
$3,509
-
MMBtu
$2,692
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs