Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PAPERBOARD CARTONS
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area
n/a
Annual Production 24,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,904 1,202,814
kWh
Natural Gas $36,380 5,843
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,022 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7245: Use direct air supply to exhaust hoods $12,369 $9,880 - $12,369
-
MMBtu
-
02 2.7243: Improve air circulation with destratification fans / other methods $2,871 $5,400 - $2,871
-
MMBtu
-
03 2.7123: Keep lamps and reflectors clean $5,076 $5,335 $4,739
71,805
kWh
- $337
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,393 $400 $1,393
21,102
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $422 $660 - $422
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,504 $390 $1,760
26,671
kWh
- $(-256.0)
07 2.6232: Install set-back timers $271 - $271
4,103
kWh
- -
08 2.4312: Improve lubrication practices $116 - $116
1,758
kWh
- -
TOTAL RECOMMENDED $24,022 $22,065 $8,279
125,439
kWh
$15,662
-
MMBtu
$81
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs