Assessment Year | 2011 |
---|---|
Principal Product | Axles & Driveline Products |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $5 M to 10M |
# of Employees | 200 |
Plant Area |
610,000
ft2
|
Annual Production | 7,500
pieces
|
Production Hrs. Annual | 4,233
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $256,196 | 5,414,038 |
kWh
|
$0.047 |
Electricity Demand | $79,019 | 10,188 |
kW-mo/yr
|
$7.76 |
Electricity Fees | $32,483 | - |
|
- |
Natural Gas | $288,948 | 38,422 |
MMBtu
|
$7.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $176,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $176,685 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $2,166 | - | - | - |
$2,166
-
MMBtu
|
- | - | |
02 | 2.7233: Use properly designed and sized hvac equipment | $156,506 | $686,583 | - | - |
$156,506
-
MMBtu
|
- | - | |
03 | 2.4321: Upgrade obsolete equipment | $12,266 | $100,000 | - | - |
$12,266
-
MMBtu
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,263 | $1,142 |
$1,030
21,914
kWh
|
$233
-
kW-mo/yr
|
- | - | - | |
05 | 2.6218: Turn off equipment when not in use | $4,441 | $382 |
$4,441
94,494
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $43 | $58 |
$9
175
kWh
|
$2
-
kW-mo/yr
|
- | $10 | $22 | |
07 | 2.6211: Conserve energy by efficient use of vending machines | $294 | - |
$240
5,100
kWh
|
$54
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $176,979 | $788,165 |
$5,720
121,683
kWh
|
$289
-
kW-mo/yr
|
$170,938
-
MMBtu
|
$10 | $22 | ||
TOTAL IMPLEMENTED | $176,685 | $788,165 |
$5,480
116,583
kWh
|
$235
-
kW-mo/yr
|
$170,938
-
MMBtu
|
$10 | $22 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs