| Assessment Year | 2010 |
|---|---|
| Principal Product | Aseptic products(food) |
| NAICS | 333241: Food Product Machinery Manufacturing |
| SIC | 3556: Food Products Machinery |
| Sales Range | $50 M to 100M |
| # of Employees | 185 |
| Plant Area |
170,000
ft2
|
| Annual Production | 8,411
ton
|
| Production Hrs. Annual | 5,304
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,008,987 | 22,276,800 |
kWh
|
$0.045 |
| Electricity Demand | $365,883 | 48,384 |
kW-mo/yr
|
$7.56 |
| Natural Gas | $138,168 | 10,140 |
MMBtu
|
$13.63 |
| Other Gas | $552,777 | 158,616 |
MMBtu
|
$3.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $269,416 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $60,774 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $100,844 | $52,100 |
$88,090
1,957,557
kWh
|
$12,754
-
kW-mo/yr
|
- | - | |
| 02 | 2.4323: Use optimum size and capacity equipment | $43,590 | $6,000 |
$43,409
964,640
kWh
|
$181
-
kW-mo/yr
|
- | - | |
| 03 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $19,885 | $35,220 | - | - |
$16,151
-
MMBtu
|
$3,734
-
MMBtu
|
|
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,289 | $6,000 | - |
$18,289
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,786 | $1,720 |
$10,072
223,837
kWh
|
$2,714
-
kW-mo/yr
|
- | - | |
| 06 | 2.2113: Repair or replace steam traps | $46,342 | $10,000 | - | - |
$46,342
-
MMBtu
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $18,237 | $12,000 | - | - |
$18,237
-
MMBtu
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,646 | $480 |
$1,193
26,533
kWh
|
$453
-
kW-mo/yr
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,383 | $15,780 |
$3,850
87,200
kWh
|
$2,533
-
kW-mo/yr
|
- | - | |
| 10 | 2.7135: Install occupancy sensors | $1,414 | $300 |
$1,414
31,470
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $269,416 | $139,600 |
$148,028
3,291,237
kWh
|
$36,924
-
kW-mo/yr
|
$80,730
-
MMBtu
|
$3,734
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $60,774 | $12,200 |
$11,265
250,370
kWh
|
$3,167
-
kW-mo/yr
|
$46,342
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs