| Assessment Year | 2003 |
|---|---|
| Principal Product | Pre-mixed Concrete |
| NAICS | 327320: Ready-Mix Concrete Manufacturing |
| SIC | 3273: Ready-Mixed Concrete |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 15,600
pieces
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $162,549 | 2,923,270 |
kWh
|
$0.056 |
| Electricity Demand | $38,665 | 145,212 |
kW-mo/yr
|
$0.27 |
| Electricity Fees | $3,648 | - |
|
- |
| Natural Gas | $21,686 | 3,350 |
MMBtu
|
$6.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,560 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,300 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $9,850 | $24,500 |
$8,040
146,000
kWh
|
$1,810
-
kW-mo/yr
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,950 | - |
$2,470
45,000
kWh
|
$480
-
kW-mo/yr
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,000 | $3,000 |
$2,470
45,000
kWh
|
$530
-
kW-mo/yr
|
- | - | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $2,260 | $290 |
$1,880
34,200
kWh
|
$380
-
kW-mo/yr
|
- | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,500 | $150 | - | - |
$1,800
-
MMBtu
|
$(-300.0) | |
| TOTAL RECOMMENDED | $19,560 | $27,940 |
$14,860
270,200
kWh
|
$3,200
-
kW-mo/yr
|
$1,800
-
MMBtu
|
$(-300.0) | ||
| TOTAL IMPLEMENTED | $17,300 | $27,650 |
$12,980
236,000
kWh
|
$2,820
-
kW-mo/yr
|
$1,800
-
MMBtu
|
$(-300.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs