ITAC Assessment: OR0438
ITAC logo
ITAC Assessment: OR0438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Pre-mixed Concrete
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area
n/a
Annual Production 15,600
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,549 2,923,270
kWh
Electricity Demand $38,665 145,212
kW-mo/yr
Electricity Fees $3,648 -
Natural Gas $21,686 3,350
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $9,850 $24,500 $8,040
146,000
kWh
$1,810
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,950 - $2,470
45,000
kWh
$480
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,000 $3,000 $2,470
45,000
kWh
$530
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $2,260 $290 $1,880
34,200
kWh
$380
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,500 $150 - - $1,800
-
MMBtu
$(-300.0)
TOTAL RECOMMENDED $19,560 $27,940 $14,860
270,200
kWh
$3,200
-
kW-mo/yr
$1,800
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $17,300 $27,650 $12,980
236,000
kWh
$2,820
-
kW-mo/yr
$1,800
-
MMBtu
$(-300.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs