Assessment Year | 1988 |
---|---|
Principal Product | PLASTIC TOTE BOXES |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $213,382 | 3,417,351 |
kWh
|
$0.062 |
Natural Gas | $15,076 | 3,644 |
MMBtu
|
$4.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,804 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,715 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $5,935 | $250 |
$5,525
-
kWh
|
$410
-
MMBtu
|
|
02 | 2.5194: Redesign process | $30,978 | $45,000 |
$30,978
496,483
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $2,750 | $150 |
$2,750
43,962
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,560 | $150 |
$1,560
24,912
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,266 | $100 |
$1,266
20,223
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $744 | $200 |
$744
12,016
kWh
|
- | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $300 | $300 |
$300
12,016
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,339 | $1,075 |
$1,339
21,395
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,932 | $752 |
$2,932
46,893
kWh
|
- | |
TOTAL RECOMMENDED | $47,804 | $47,977 |
$47,394
677,900
kWh
|
$410
-
MMBtu
|
||
TOTAL IMPLEMENTED | $43,715 | $46,752 |
$43,305
612,543
kWh
|
$410
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs