ITAC Assessment: CO0133
ITAC logo
ITAC Assessment: CO0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PLASTIC TOTE BOXES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 7,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,382 3,417,351
kWh
Natural Gas $15,076 3,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $5,935 $250 $5,525
-
kWh
$410
-
MMBtu
02 2.5194: Redesign process $30,978 $45,000 $30,978
496,483
kWh
-
03 2.2511: Insulate bare equipment $2,750 $150 $2,750
43,962
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,560 $150 $1,560
24,912
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,266 $100 $1,266
20,223
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $744 $200 $744
12,016
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $300 $300 $300
12,016
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,339 $1,075 $1,339
21,395
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,932 $752 $2,932
46,893
kWh
-
TOTAL RECOMMENDED $47,804 $47,977 $47,394
677,900
kWh
$410
-
MMBtu
TOTAL IMPLEMENTED $43,715 $46,752 $43,305
612,543
kWh
$410
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs