ITAC Assessment: TN0456
ITAC logo
ITAC Assessment: TN0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BOTTLED BEVERAGES
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 127
Plant Area
n/a
Annual Production 12,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,817 4,805,100
kWh
Natural Gas $126,554 26,208
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,223 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $1,838 $3,300 - $1,838
-
MMBtu
02 2.4312: Improve lubrication practices $2,396 - $2,396
39,273
kWh
-
03 2.2122: Install / repair insulation on condensate lines $610 $45 - $610
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $1,806 $470 $1,806
29,601
kWh
-
05 2.7261: Install timers and/or thermostats $787 $420 $787
12,896
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $786 $700 $786
12,896
kWh
-
TOTAL RECOMMENDED $8,223 $4,935 $5,775
94,666
kWh
$2,448
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs