ITAC Assessment: OR0598
ITAC logo
ITAC Assessment: OR0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Steel
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area 40,000
ft2
Annual Production 10,400,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,388 4,950,030
kWh
Electricity Demand $163,636 26,345
kW-mo/yr
Electricity Fees $24,072 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $440,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 3.5221: Recycle casting sand $437,377 $71,170 - - $20,000
-
lb
$417,377
02 2.4224: Upgrade controls on compressors $2,289 $1,015 $1,089
23,197
kWh
$1,200
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,034 $1,534 $617
13,142
kWh
$417
-
kW-mo/yr
- -
TOTAL RECOMMENDED $440,700 $73,719 $1,706
36,339
kWh
$1,617
-
kW-mo/yr
$20,000
-
lb
$417,377
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs