ITAC Assessment: OR0365
ITAC logo
ITAC Assessment: OR0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Manufatured Homes
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 240,000
ft2
Annual Production 1,075
pieces
Production Hrs. Annual 1,920
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,707 3,888,000
kWh
Electricity Demand $15,316 54,780
kW-mo/yr
Electricity Fees $960 -
Natural Gas $74,529 14,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,216 $4,300 $4,441
125,733
kWh
$3,775
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $618 - $329
9,379
kWh
$289
-
kW-mo/yr
- - -
03 2.8112: Combine utility meters $4,844 $9,721 - - $4,844
-
MMBtu
- -
04 2.7224: Reduce space conditioning during non-working hours $35,788 $1,690 - - $35,788
-
MMBtu
- -
05 3.5217: Reuse / recycle/ sell paper products $4,180 - - - - $5,620
-
lb
$(-1,440.0)
TOTAL RECOMMENDED $53,646 $15,711 $4,770
135,112
kWh
$4,064
-
kW-mo/yr
$40,632
-
MMBtu
$5,620
-
lb
$(-1,440.0)
TOTAL IMPLEMENTED $48,848 $15,711 $4,441
125,733
kWh
$3,775
-
kW-mo/yr
$40,632
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs