Assessment Year | 1991 |
---|---|
Principal Product | HYDRAULIC PRESSES |
NAICS |
n/a
|
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 74 |
Plant Area |
n/a
|
Annual Production | 200
pieces
|
Production Hrs. Annual | 2,230
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $35,981 | 408,265 |
kWh
|
$0.088 |
Natural Gas | $9,448 | 1,952 |
MMBtu
|
$4.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,428 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,428 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $2,097 | $700 |
$748
8,499
kWh
|
$1,349
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,895 | $12,140 |
$3,895
44,256
kWh
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $1,186 | - |
$1,186
13,482
kWh
|
- | |
04 | 2.6214: Shut off pilots in standby equipment | $192 | - | - |
$192
-
MMBtu
|
|
05 | 2.6232: Install set-back timers | $490 | - |
$490
5,569
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $181 | $40 |
$181
2,052
kWh
|
- | |
07 | 2.4312: Improve lubrication practices | $181 | $300 |
$181
2,052
kWh
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $103 | - |
$103
1,172
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $103 | $110 |
$103
1,172
kWh
|
- | |
TOTAL RECOMMENDED | $8,428 | $13,290 |
$6,887
78,254
kWh
|
$1,541
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,428 | $13,290 |
$6,887
78,254
kWh
|
$1,541
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs