ITAC Assessment: TN0429
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HYDRAULIC PRESSES
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 74
Plant Area
n/a
Annual Production 200
pieces
Production Hrs. Annual 2,230
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,981 408,265
kWh
Natural Gas $9,448 1,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,428 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,428

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $2,097 $700 $748
8,499
kWh
$1,349
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,895 $12,140 $3,895
44,256
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $1,186 - $1,186
13,482
kWh
-
04 2.6214: Shut off pilots in standby equipment $192 - - $192
-
MMBtu
05 2.6232: Install set-back timers $490 - $490
5,569
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $181 $40 $181
2,052
kWh
-
07 2.4312: Improve lubrication practices $181 $300 $181
2,052
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $103 - $103
1,172
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $103 $110 $103
1,172
kWh
-
TOTAL RECOMMENDED $8,428 $13,290 $6,887
78,254
kWh
$1,541
-
MMBtu
TOTAL IMPLEMENTED $8,428 $13,290 $6,887
78,254
kWh
$1,541
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs