ITAC Assessment: TN0427
ITAC logo
ITAC Assessment: TN0427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FACE BRICK
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $1
M
to 5
M
# of Employees 64
Plant Area
n/a
Annual Production 45,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,339 3,361,958
kWh
Natural Gas $461,783 116,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $21,914 $2,080 - $21,914
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $13,988 - $13,988
237,104
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,945 $2,250 $4,945
83,822
kWh
-
04 2.7261: Install timers and/or thermostats $1,007 $460 $138
2,345
kWh
$869
-
MMBtu
05 2.6232: Install set-back timers $1,764 - $1,764
29,894
kWh
-
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $916 - $916
15,533
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,026 $1,212 $3,026
51,290
kWh
-
TOTAL RECOMMENDED $47,560 $6,002 $24,777
419,988
kWh
$22,783
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs