ITAC Assessment: NC0225
ITAC logo
ITAC Assessment: NC0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Dyed woven fabrics
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 750,000
ft2
Annual Production 750,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $523,100 5,587,630
kWh
Electricity Demand $382,459 40,800
kW-mo/yr
Electricity Fees $9,657 -
Natural Gas $1,969,268 270,951
MMBtu
Coal $1,000,000 487,805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,927 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,182

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Coal Savings Administrative Changes Savings Primary Product Savings
01 2.4151: Develop a repair/replace policy $2,783 $1,895 $1,649
60,189
kWh
$1,134
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,625 $33,848 $9,259
337,914
kWh
$6,366
-
kW-mo/yr
- - -
03 2.4156: Establish a preventative maintenance program $27,745 $33,990 n/a $6,028
220,000
kWh
$6,217
-
kW-mo/yr
- $10,000 $5,500
04 2.1115: Eliminate combustible gas in flue gas $15,365 $5,000 - - $15,365
-
MMBtu
- -
05 2.1135: Repair furnaces and oven doors so that they seal efficiently $20,000 $40,000 n/a $964
35,200
kWh
$668
-
kW-mo/yr
$18,368
-
MMBtu
- -
06 2.1232: Keep boiler tubes clean $3,649 $13,000 - - $3,649
-
MMBtu
- -
07 2.2135: Repair and eliminate steam leaks $8,655 $3,500 - - $8,655
-
MMBtu
- -
08 2.2414: Use waste heat from hot flue gases to preheat $28,105 $100,000 - - $28,105
-
MMBtu
- -
TOTAL RECOMMENDED $121,927 $231,233 $17,900
653,303
kWh
$14,385
-
kW-mo/yr
$74,142
-
MMBtu
$10,000 $5,500
TOTAL IMPLEMENTED $74,182 $157,243 $10,908
398,103
kWh
$7,500
-
kW-mo/yr
$55,774
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Coal Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs