ITAC Assessment: TN0425
ITAC logo
ITAC Assessment: TN0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BOXED CHOCOLATE CANDY
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area
n/a
Annual Production 23,000,000
lb
Production Hrs. Annual 4,410
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,037,559 21,675,264
kWh
Natural Gas $237,565 66,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $73,469 $87,400 - $73,469
-
MMBtu
-
02 2.6232: Install set-back timers $20,275 - $20,275
422,333
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $9,594 - $9,594
199,883
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $5,698 $760 $5,698
118,699
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,398 - $4,738
98,769
kWh
- $(-1,340.0)
TOTAL RECOMMENDED $112,434 $88,160 $40,305
839,684
kWh
$73,469
-
MMBtu
$(-1,340.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs