ITAC Assessment: OK1035
ITAC logo
ITAC Assessment: OK1035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 37
Plant Area 193,522
ft2
Annual Production 109,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,967 925,488
kWh
Electricity Demand $23,681 1,986
kW-mo/yr
Electricity Fees $1,092 -
Natural Gas $2,041 422
MMBtu
Waste Disposal Costs
Water Usage $8,114 678
Tgal
TOTAL YEARLY COSTS $104,895
RECOMMENDED SAVINGS* $17,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,099 $5,247 $6,099
80,669
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,472 $6,388 $3,472
45,920
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,459 $8,757 $2,759
36,498
kWh
$700
-
kW-mo/yr
04 2.4322: Use or replace with energy efficient substitutes $2,243 $4,000 $2,243
29,667
kWh
-
05 2.7224: Reduce space conditioning during non-working hours $1,774 - $1,774
23,468
kWh
-
TOTAL RECOMMENDED $17,047 $24,392 $16,347
216,222
kWh
$700
-
kW-mo/yr
TOTAL IMPLEMENTED $11,814 $15,635 $11,814
156,256
kWh
-