ITAC Assessment: TN0419
ITAC logo
ITAC Assessment: TN0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product NEWSPAPER
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 600
Plant Area
n/a
Annual Production 62,000,000
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,700 5,733,001
kWh
Natural Gas $13,586 2,621
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,656 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $7,626 $15,520 $7,626
155,627
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $2,142 $5,600 - $2,142
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $2,007 $1,042 - $2,007
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,300 $1,760 - $1,300
-
MMBtu
05 2.7221: Lower temperature during the winter season and vice-versa $618 - $618
12,603
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $546 $517 $546
11,137
kWh
-
07 2.6232: Install set-back timers $417 - $417
8,499
kWh
-
08 2.3212: Optimize plant power factor $6,000 $10,000 $6,000
-
kWh
-
TOTAL RECOMMENDED $20,656 $34,439 $15,207
187,866
kWh
$5,449
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs