| Assessment Year | 1995 |
|---|---|
| Principal Product | Prepreg (B-Stage) & Copper Clad |
| NAICS |
n/a
|
| SIC | 3672: Printed Circuit Boards |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
40,000
ft2
|
| Annual Production | 3,000,000
thousand feet
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $45,932 | 467,468 |
kWh
|
$0.098 |
| Natural Gas | $152,247 | 35,711 |
MMBtu
|
$4.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $94,394 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $93,233 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,166 | $1,030 |
$1,166
12,016
kWh
|
- | |
| 02 | 2.2423: Install waste heat boiler to produce steam | $77,121 | $121,250 | - |
$77,121
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $2,871 | $2,761 | - |
$2,871
-
MMBtu
|
|
| 04 | 2.2511: Insulate bare equipment | $809 | $1,970 | - |
$809
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,430 | $5,990 |
$4,430
45,135
kWh
|
- | |
| 06 | 2.7144: Install spectral reflectors / delamp | $6,836 | $3,940 |
$6,836
64,771
kWh
|
- | |
| 07 | 2.7135: Install occupancy sensors | $1,161 | $880 |
$1,161
11,137
kWh
|
- | |
| TOTAL RECOMMENDED | $94,394 | $137,821 |
$13,593
133,059
kWh
|
$80,801
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $93,233 | $136,941 |
$12,432
121,922
kWh
|
$80,801
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs