ITAC Assessment: SD0120
ITAC logo
ITAC Assessment: SD0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Prepreg (B-Stage) & Copper Clad
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 3,000,000
thousand feet
Production Hrs. Annual 5,460
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,932 467,468
kWh
Natural Gas $152,247 35,711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,166 $1,030 $1,166
12,016
kWh
-
02 2.2423: Install waste heat boiler to produce steam $77,121 $121,250 - $77,121
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $2,871 $2,761 - $2,871
-
MMBtu
04 2.2511: Insulate bare equipment $809 $1,970 - $809
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,430 $5,990 $4,430
45,135
kWh
-
06 2.7144: Install spectral reflectors / delamp $6,836 $3,940 $6,836
64,771
kWh
-
07 2.7135: Install occupancy sensors $1,161 $880 $1,161
11,137
kWh
-
TOTAL RECOMMENDED $94,394 $137,821 $13,593
133,059
kWh
$80,801
-
MMBtu
TOTAL IMPLEMENTED $93,233 $136,941 $12,432
121,922
kWh
$80,801
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs