ITAC Assessment: TN0410
ITAC logo
ITAC Assessment: TN0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product TOOTH & SCRUB BRUSHES
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area
n/a
Annual Production 140,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $506,118 9,667,937
kWh
Natural Gas $15,953 2,483
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,539

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $25,287 $29,907 $22,647
435,522
kWh
- $2,640
02 2.6232: Install set-back timers $11,948 - $11,948
229,777
kWh
- -
03 2.3212: Optimize plant power factor $13,343 $44,500 $13,343
-
kWh
- -
04 2.7261: Install timers and/or thermostats $11,650 $7,440 $8,245
158,558
kWh
$3,405
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,844 $930 $14,844
285,463
kWh
- -
06 2.6232: Install set-back timers $9,891 $7,200 $9,891
190,211
kWh
- -
07 2.4312: Improve lubrication practices $3,261 - $3,261
62,720
kWh
- -
08 2.6122: Adjust vents to minimize energy use $2,515 $3,600 $2,515
48,359
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $4,602 - $5,440
104,631
kWh
- $(-838.0)
10 2.6122: Adjust vents to minimize energy use $975 $1,545 $975
18,757
kWh
- -
TOTAL RECOMMENDED $98,316 $95,122 $93,109
1,533,998
kWh
$3,405
-
MMBtu
$1,802
TOTAL IMPLEMENTED $72,539 $78,937 $70,737
1,103,752
kWh
- $1,802
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs