ITAC Assessment: TT0267
ITAC logo
ITAC Assessment: TT0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Porcelain Tile Manufacturing and Processing
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $50
M
to 100
M
# of Employees 445
Plant Area 750,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,238,125 29,471,850
kWh
Electricity Demand $1,073,036 136,662
kW-mo/yr
Natural Gas $1,781,887 508,332
MMBtu
Waste Disposal Costs
Water Usage $88,810 16,549
Tgal
Water Disposal $3,718 387
Tgal
TOTAL YEARLY COSTS $4,185,576
RECOMMENDED SAVINGS* $144,544 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,717

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1213: Direct warmest air to combustion intake $67,587 $45,000 - - - $67,587
-
MMBtu
02 2.3212: Optimize plant power factor $17,048 $14,849 - - $17,048 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,038 $18,000 $16,038
381,848
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,631 $17,010 $9,804
233,436
kWh
$2,827
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,510 $12,000 $7,571
180,280
kWh
$1,939
-
kW-mo/yr
- -
06 2.4323: Use optimum size and capacity equipment $9,445 $5,000 $7,485
178,214
kWh
$1,960
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,489 $1,920 $6,353
151,283
kWh
$136
-
kW-mo/yr
- -
08 2.2437: Recover waste heat from equipment $5,797 $5,000 - - - $5,797
-
MMBtu
TOTAL RECOMMENDED $144,544 $118,779 $47,251
1,125,061
kWh
$6,861
-
kW-mo/yr
$17,048 $73,384
-
MMBtu
TOTAL IMPLEMENTED $45,717 $49,859 $25,842
615,284
kWh
$2,827
-
kW-mo/yr
$17,048 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs