ITAC Assessment: MA0180
ITAC logo
ITAC Assessment: MA0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product DISPOSABLE MED. DEVICES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 3,000
pieces
Production Hrs. Annual 6,528
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,591 3,507,913
kWh
Natural Gas $44,906 7,010
MMBtu
Fuel Oil #2 $8,830 1,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,127

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $7,523 $5,750 - $7,523
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,604 $334 $2,604
29,894
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,957 $6,200 $8,450
97,011
kWh
$(-2,493.0)
-
MMBtu
TOTAL RECOMMENDED $16,084 $12,284 $11,054
126,905
kWh
$5,030
-
MMBtu
TOTAL IMPLEMENTED $10,127 $6,084 $2,604
29,894
kWh
$7,523
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs