Assessment Year | 1990 |
---|---|
Principal Product | PAPERBOARD PACKAGING |
NAICS |
n/a
|
SIC | 2652: Setup Paperboard Boxes |
Sales Range | $10 M to 50M |
# of Employees | 93 |
Plant Area |
n/a
|
Annual Production | 20,000
ton
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $166,907 | 2,927,902 |
kWh
|
$0.057 |
Natural Gas | $10,846 | 1,748 |
MMBtu
|
$6.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,077 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,835 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,279 | - |
$5,279
92,614
kWh
|
- | - | |
02 | 2.7492: Use proper thickness of insulation on building envelope | $1,544 | $3,195 | - |
$1,544
-
MMBtu
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $3,308 | $300 |
$3,308
58,030
kWh
|
- | - | |
04 | 2.7123: Keep lamps and reflectors clean | $2,426 | $5,083 |
$2,138
37,515
kWh
|
- | $288 | |
05 | 2.6232: Install set-back timers | $1,470 | - |
$1,470
25,791
kWh
|
- | - | |
06 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,403 | $245 |
$1,403
24,619
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $568 | $660 |
$568
9,965
kWh
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $368 | - |
$368
6,448
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $418 | $195 |
$418
7,327
kWh
|
- | - | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $15,293 | $31,800 |
$27,147
476,260
kWh
|
$(-11,854.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $32,077 | $41,478 |
$42,099
738,569
kWh
|
$(-10,310.0)
-
MMBtu
|
$288 | ||
TOTAL IMPLEMENTED | $4,835 | $3,635 |
$3,291
57,737
kWh
|
$1,544
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs