Assessment Year | 1990 |
---|---|
Principal Product | LEAD WHEEL WEIGHTS |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 54 |
Plant Area |
n/a
|
Annual Production | 18,000,000
lb
|
Production Hrs. Annual | 5,106
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $253,754 | 3,656,800 |
kWh
|
$0.069 |
Fuel Oil #2 | $14,762 | 3,500 |
MMBtu
|
$4.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,963 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,616 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $13,078 | $3,272 |
$13,078
189,625
kWh
|
- | - | |
02 | 2.2163: Use minimum steam operating pressure | $1,676 | - | - |
$1,676
-
MMBtu
|
- | |
03 | 2.7123: Keep lamps and reflectors clean | $6,691 | $15,675 |
$6,309
91,442
kWh
|
- | $382 | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $21,618 | $7,350 |
$21,618
313,306
kWh
|
- | - | |
05 | 2.2153: Close off unneeded steam lines | $403 | - | - |
$403
-
MMBtu
|
- | |
06 | 2.6232: Install set-back timers | $1,598 | - |
$1,598
23,154
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,257 | $490 |
$1,257
18,171
kWh
|
- | - | |
08 | 2.4312: Improve lubrication practices | $1,005 | $450 |
$1,005
14,654
kWh
|
- | - | |
09 | 2.2122: Install / repair insulation on condensate lines | $90 | $200 | - |
$90
-
MMBtu
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $283 | $1,000 |
$283
4,103
kWh
|
- | - | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $264 | $120 |
$264
3,810
kWh
|
- | - | |
TOTAL RECOMMENDED | $47,963 | $28,557 |
$45,412
658,265
kWh
|
$2,169
-
MMBtu
|
$382 | ||
TOTAL IMPLEMENTED | $16,616 | $3,392 |
$14,940
216,589
kWh
|
$1,676
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs