ITAC Assessment: TN0388
ITAC logo
ITAC Assessment: TN0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product LEAD WHEEL WEIGHTS
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area
n/a
Annual Production 18,000,000
lb
Production Hrs. Annual 5,106
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,754 3,656,800
kWh
Fuel Oil #2 $14,762 3,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,963 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,616

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $13,078 $3,272 $13,078
189,625
kWh
- -
02 2.2163: Use minimum steam operating pressure $1,676 - - $1,676
-
MMBtu
-
03 2.7123: Keep lamps and reflectors clean $6,691 $15,675 $6,309
91,442
kWh
- $382
04 2.6212: Turn off equipment during breaks, reduce operating time $21,618 $7,350 $21,618
313,306
kWh
- -
05 2.2153: Close off unneeded steam lines $403 - - $403
-
MMBtu
-
06 2.6232: Install set-back timers $1,598 - $1,598
23,154
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $1,257 $490 $1,257
18,171
kWh
- -
08 2.4312: Improve lubrication practices $1,005 $450 $1,005
14,654
kWh
- -
09 2.2122: Install / repair insulation on condensate lines $90 $200 - $90
-
MMBtu
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $283 $1,000 $283
4,103
kWh
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $264 $120 $264
3,810
kWh
- -
TOTAL RECOMMENDED $47,963 $28,557 $45,412
658,265
kWh
$2,169
-
MMBtu
$382
TOTAL IMPLEMENTED $16,616 $3,392 $14,940
216,589
kWh
$1,676
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs