ITAC Assessment: TN0380
ITAC logo
ITAC Assessment: TN0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product COPPER CLAD LAMINATES
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $50
M
to 100
M
# of Employees 185
Plant Area
n/a
Annual Production 30,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $801,737 18,230,071
kWh
Natural Gas $765,836 228,661
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,885

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7141: Lower light fixtures in high ceiling areas $67,651 $61,200 $67,651
1,537,515
kWh
-
02 2.2135: Repair and eliminate steam leaks $4,181 $75 - $4,181
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,143 $6,750 $9,143
207,796
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,910 $420 $8,910
202,521
kWh
-
05 2.6232: Install set-back timers $6,151 $6,350 $6,151
139,801
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $3,869 $440 $3,869
87,925
kWh
-
TOTAL RECOMMENDED $99,905 $75,235 $95,724
2,175,558
kWh
$4,181
-
MMBtu
TOTAL IMPLEMENTED $89,885 $68,445 $85,704
1,947,832
kWh
$4,181
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs