ITAC Assessment: TN0372
ITAC logo
ITAC Assessment: TN0372
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product TRUCK BRAKE COMPONENTS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 411
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $641,636 13,322,978
kWh
Natural Gas $108,859 23,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7492: Use proper thickness of insulation on building envelope $46,225 $71,400 - $46,225
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $5,688 $1,541 - $5,688
-
MMBtu
-
03 2.6232: Install set-back timers $10,030 - $10,030
208,968
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,795 - - $2,195
-
MMBtu
$(-400.0)
05 2.7261: Install timers and/or thermostats $1,716 $280 $1,716
35,756
kWh
- -
06 2.4312: Improve lubrication practices $1,716 $1,800 $1,716
35,756
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $282 - $1,182
24,619
kWh
- $(-900.0)
TOTAL RECOMMENDED $67,452 $75,021 $14,644
305,099
kWh
$54,108
-
MMBtu
$(-1,300.0)
TOTAL IMPLEMENTED $47,941 $71,680 $1,716
35,756
kWh
$46,225
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs