ITAC Assessment: AR0153
ITAC logo
ITAC Assessment: AR0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Automotive Equip.
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 214,350
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 2,346
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,717 5,905,627
kWh
Electricity Demand $72,207 11,438
kW-mo/yr
Natural Gas $49,737 11,474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $190,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $175,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $245 $913 $176
5,862
kWh
$69
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $674 - $369
12,016
kWh
$305
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $764 $540 $371
12,016
kWh
$393
-
kW-mo/yr
- - -
04 2.6218: Turn off equipment when not in use $14,173 $1,565 $14,173
457,210
kWh
- - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,917 - $(-194.0)
(-8,499)
kWh
- - $2,111
-
lb
-
06 3.4116: Meter recycled water (to reduce sewer charges) $2,493 $1,000 - - $2,493
-
Tgal
- -
07 4.513: Re-arrange equipment layout to reduce labor costs $63,905 $16,750 - - - - $63,905
08 4.513: Re-arrange equipment layout to reduce labor costs $106,508 $25,000 - - - - $106,508
TOTAL RECOMMENDED $190,679 $45,768 $14,895
478,605
kWh
$767
-
kW-mo/yr
$2,493
-
Tgal
$2,111
-
lb
$170,413
TOTAL IMPLEMENTED $175,742 $43,663 $351
9,379
kWh
$374
-
kW-mo/yr
$2,493
-
Tgal
$2,111
-
lb
$170,413
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs