ITAC Assessment: TN0357
ITAC logo
ITAC Assessment: TN0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product STRAPS, HUBS & SPINDLES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 7,200,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $332,033 6,495,897
kWh
Natural Gas $32,364 6,071
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,000 $900 $11,000
215,709
kWh
-
02 2.7141: Lower light fixtures in high ceiling areas $7,743 $4,388 $7,743
151,817
kWh
-
03 2.2437: Recover waste heat from equipment $4,409 $1,380 - $4,409
-
MMBtu
04 2.2511: Insulate bare equipment $3,004 $355 $3,004
58,910
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $928 $1,110 - $928
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,541 - $2,541
49,824
kWh
-
07 2.7261: Install timers and/or thermostats $1,315 $560 $1,315
25,791
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $673 $180 $673
13,189
kWh
-
09 2.7122: Disconnect ballasts $254 $273 $254
4,982
kWh
-
10 2.3212: Optimize plant power factor $4,607 $6,600 $4,607
-
kWh
-
TOTAL RECOMMENDED $36,474 $15,746 $31,137
520,222
kWh
$5,337
-
MMBtu
TOTAL IMPLEMENTED $28,058 $11,178 $22,721
355,216
kWh
$5,337
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs