ITAC Assessment: UM0476
ITAC logo
ITAC Assessment: UM0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Fine Meat Products
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 3,640
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,832 2,596,000
kWh
Natural Gas $168,729 26,388
MMBtu
TOTAL YEARLY COSTS $407,561
RECOMMENDED SAVINGS* $53,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $10,342 $9,000 $10,342
112,400
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $13,110 $16,000 $13,110
142,500
kWh
-
03 2.7135: Install occupancy sensors $1,056 $2,500 $1,056
11,480
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $11,512 $8,125 - $11,512
-
MMBtu
05 2.2437: Recover waste heat from equipment $17,157 $50,000 - $17,157
-
MMBtu
TOTAL RECOMMENDED $53,177 $85,625 $24,508
266,380
kWh
$28,669
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs