Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Machined metal parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 24,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,629 620,692
kWh
Electricity Demand $20,532 1,196
kW-mo/yr
Natural Gas $2,677 128
MMBtu
TOTAL YEARLY COSTS $193,838
RECOMMENDED SAVINGS* $70,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $58,845 $236,368 $55,516
224,218
kWh
$3,329
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,201 - $2,045
8,258
kWh
$156
-
kW-mo/yr
- -
03 2.8114: Change rate schedules or other changes in utility service $6,541 - - - $6,541 -
04 2.7221: Lower temperature during the winter season and vice-versa $480 - - - - $480
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $2,785 $1,200 $2,785
11,232
kWh
- - -
TOTAL RECOMMENDED $70,852 $237,568 $60,346
243,708
kWh
$3,485
-
kW-mo/yr
$6,541 $480
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs