| Assessment Year | 2023 |
|---|---|
| Principal Product | Machined metal parts |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
24,000
ft2
|
| Annual Production | 1,000
units
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $170,629 | 620,692 |
kWh
|
$0.27 |
| Electricity Demand | $20,532 | 1,196 |
kW-mo/yr
|
$17.16 |
| Natural Gas | $2,677 | 128 |
MMBtu
|
$20.88 |
| TOTAL YEARLY COSTS | $193,838 | |||
| RECOMMENDED SAVINGS* | $70,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $58,845 | $236,368 |
$55,516
224,218
kWh
|
$3,329
-
kW-mo/yr
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,201 | - |
$2,045
8,258
kWh
|
$156
-
kW-mo/yr
|
- | - | |
| 03 | 2.8114: Change rate schedules or other changes in utility service | $6,541 | - | - | - | $6,541 | - | |
| 04 | 2.7221: Lower temperature during the winter season and vice-versa | $480 | - | - | - | - |
$480
-
MMBtu
|
|
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,785 | $1,200 |
$2,785
11,232
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $70,852 | $237,568 |
$60,346
243,708
kWh
|
$3,485
-
kW-mo/yr
|
$6,541 |
$480
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs