| Assessment Year | 1988 |
|---|---|
| Principal Product | PRECISION METAL CASTINGS |
| NAICS |
n/a
|
| SIC | 3324: Steel Investment Foundries |
| Sales Range | $1 M to 5M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 600,000
lb
|
| Production Hrs. Annual | 4,862
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $109,635 | 1,638,042 |
kWh
|
$0.067 |
| Natural Gas | $31,204 | 6,121 |
MMBtu
|
$5.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,331 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,232 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $3,932 | $14,800 | - |
$3,932
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,719 | $300 |
$8,719
130,129
kWh
|
- | |
| 03 | 2.2135: Repair and eliminate steam leaks | $2,076 | $440 | - |
$2,076
-
MMBtu
|
|
| 04 | 2.7261: Install timers and/or thermostats | $755 | $1,040 | - |
$755
-
MMBtu
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $750 | $1,019 | - |
$750
-
MMBtu
|
|
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,533 | $875 |
$2,533
37,808
kWh
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $722 | - |
$722
10,844
kWh
|
- | |
| 08 | 2.4312: Improve lubrication practices | $412 | $232 |
$412
6,155
kWh
|
- | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $432 | $195 |
$432
6,448
kWh
|
- | |
| TOTAL RECOMMENDED | $20,331 | $18,901 |
$12,818
191,384
kWh
|
$7,513
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,232 | $2,829 |
$12,406
185,229
kWh
|
$2,826
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs