ITAC Assessment: TN0341
ITAC logo
ITAC Assessment: TN0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product METAL STAMPING; BRAZING
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 40,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,077 4,398,886
kWh
Natural Gas $46,846 12,127
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $7,301 $11,508 $7,301
152,110
kWh
-
02 2.7261: Install timers and/or thermostats $1,849 $128 $422
8,792
kWh
$1,427
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,137 $1,750 $3,137
65,358
kWh
-
04 2.4312: Improve lubrication practices $2,195 $1,650 $2,195
45,721
kWh
-
05 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $2,054 - $2,054
42,790
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $1,646 $765 $1,646
34,291
kWh
-
07 2.7243: Improve air circulation with destratification fans / other methods $429 $1,600 - $429
-
MMBtu
TOTAL RECOMMENDED $18,611 $17,401 $16,755
349,062
kWh
$1,856
-
MMBtu
TOTAL IMPLEMENTED $4,332 $1,728 $2,476
51,582
kWh
$1,856
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs