Assessment Year | 1988 |
---|---|
Principal Product | METAL STAMPING; BRAZING |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 85 |
Plant Area |
n/a
|
Annual Production | 40,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $209,077 | 4,398,886 |
kWh
|
$0.048 |
Natural Gas | $46,846 | 12,127 |
MMBtu
|
$3.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,611 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,332 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $7,301 | $11,508 |
$7,301
152,110
kWh
|
- | |
02 | 2.7261: Install timers and/or thermostats | $1,849 | $128 |
$422
8,792
kWh
|
$1,427
-
MMBtu
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,137 | $1,750 |
$3,137
65,358
kWh
|
- | |
04 | 2.4312: Improve lubrication practices | $2,195 | $1,650 |
$2,195
45,721
kWh
|
- | |
05 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $2,054 | - |
$2,054
42,790
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,646 | $765 |
$1,646
34,291
kWh
|
- | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $429 | $1,600 | - |
$429
-
MMBtu
|
|
TOTAL RECOMMENDED | $18,611 | $17,401 |
$16,755
349,062
kWh
|
$1,856
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,332 | $1,728 |
$2,476
51,582
kWh
|
$1,856
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs