ITAC Assessment: SU0518
ITAC logo
ITAC Assessment: SU0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Advertising Inserts
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 54,780
ft2
Annual Production 1,000,000,000
units
Production Hrs. Annual 4,992
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,857 3,739,415
kWh
Electricity Demand $195,602 9,910
kW-mo/yr
Electricity Fees $28,814 -
Natural Gas $149,827 26,188
MMBtu
Waste Disposal Costs
Water Usage $10,000 177,000
Tgal
Solid Waste (non-haz) $10,000 10,000
lb
TOTAL YEARLY COSTS $455,100
RECOMMENDED SAVINGS* $17,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $2,804 - - - - $2,804
02 2.4322: Use or replace with energy efficient substitutes $1,159 $44 $161
10,080
kWh
$1,244
-
kW-mo/yr
$(-246.0)
-
MMBtu
-
03 2.2511: Insulate bare equipment $3,498 $196 $(-7.7)
(-481)
kWh
$(-13.1)
-
kW-mo/yr
$3,519
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,298 $675 - $9,298
-
kW-mo/yr
- -
05 2.7224: Reduce space conditioning during non-working hours $132 $84 - - $132
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $330 $222 $15
920
kWh
$25
-
kW-mo/yr
- $291
07 2.7135: Install occupancy sensors $176 $723 $176
10,979
kWh
- - -
TOTAL RECOMMENDED $17,397 $1,944 $344
21,498
kWh
$10,554
-
kW-mo/yr
$3,405
-
MMBtu
$3,095
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs