Assessment Year | 1995 |
---|---|
Principal Product | Caps and Hats |
NAICS |
n/a
|
SIC | 2353: Hats, Caps, and Millinery |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
51,000
ft2
|
Annual Production | 2,800,000
pieces
|
Production Hrs. Annual | 4,400
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,472 | 1,282,532 |
kWh
|
$0.061 |
Natural Gas | $12,444 | 2,092 |
MMBtu
|
$5.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,807 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,961 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,744 | $3,350 |
$4,744
58,910
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,038 | $12,424 |
$2,038
76,495
kWh
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $2,634 | $8,046 |
$2,634
33,118
kWh
|
- | - | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,357 | $500 | - |
$3,357
-
MMBtu
|
- | - | |
05 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $1,460 | $775 | - |
$1,460
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,308 | $471 |
$2,308
18,464
kWh
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,308 | $40 |
$2,308
27,843
kWh
|
- | - | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $918 | $1,780 |
$1,698
30,774
kWh
|
$(-780.0)
-
MMBtu
|
- | - | |
09 | 3.7196: Use re-usable filters | $3,640 | $623 | - | - |
$3,640
-
lb
|
- | |
10 | 3.4113: Treat and reuse rinse waters | $1,400 | $1,450 | - | - | - | $1,400 | |
TOTAL RECOMMENDED | $24,807 | $29,459 |
$15,730
245,604
kWh
|
$4,037
-
MMBtu
|
$3,640
-
lb
|
$1,400 | ||
TOTAL IMPLEMENTED | $10,961 | $6,075 |
$4,744
58,910
kWh
|
$4,817
-
MMBtu
|
- | $1,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs