ITAC Assessment: TN0338
ITAC logo
ITAC Assessment: TN0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SOFT DRINKS
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 78
Plant Area
n/a
Annual Production 12,500,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $235,247 4,098,183
kWh
Natural Gas $69,908 22,557
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $10,835 $42,500 - $10,835
-
MMBtu
02 2.7261: Install timers and/or thermostats $5,878 $2,140 - $5,878
-
MMBtu
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,173 $375 - $2,173
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $1,373 $4,250 - $1,373
-
MMBtu
05 2.4312: Improve lubrication practices $2,472 $3,600 $2,472
43,376
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,523 - $2,523
44,256
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $518 $710 $518
9,086
kWh
-
TOTAL RECOMMENDED $25,772 $53,575 $5,513
96,718
kWh
$20,259
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs