ITAC Assessment: WM0043
ITAC logo
ITAC Assessment: WM0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Formed wire components
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 60,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,968 1,227,120
kWh
Electricity Demand $26,156 3,487
kW-mo/yr
Electricity Fees $7,754 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,399 $38,020 $6,873
104,139
kWh
$4,235
-
kW-mo/yr
- $2,291
02 2.4226: Use / purchase optimum sized compressor $2,588 - $1,949
29,536
kWh
$639
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,070 $400 $3,818
57,842
kWh
$1,252
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,039 $4,600 $2,334
35,345
kWh
$705
-
kW-mo/yr
- -
05 2.4314: Use synthetic lubricant $680 $127 $512
7,765
kWh
$168
-
kW-mo/yr
- -
06 2.8123: Pay utility bills on time $211 - - - $211 -
07 2.7144: Install spectral reflectors / delamp $820 $400 $530
8,037
kWh
$290
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $435 $1,138 $260
4,885
kWh
- - $175
TOTAL RECOMMENDED $26,242 $44,685 $16,276
247,549
kWh
$7,289
-
kW-mo/yr
$211 $2,466
TOTAL IMPLEMENTED $21,703 $39,558 $12,900
196,402
kWh
$6,126
-
kW-mo/yr
$211 $2,466
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs