Assessment Year | 2014 |
---|---|
Principal Product | Formed wire components |
NAICS | 332618: Other Fabricated Wire Product Manufacturing |
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
60,000
ft2
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $80,968 | 1,227,120 |
kWh
|
$0.066 |
Electricity Demand | $26,156 | 3,487 |
kW-mo/yr
|
$7.50 |
Electricity Fees | $7,754 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,242 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,703 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,399 | $38,020 |
$6,873
104,139
kWh
|
$4,235
-
kW-mo/yr
|
- | $2,291 | |
02 | 2.4226: Use / purchase optimum sized compressor | $2,588 | - |
$1,949
29,536
kWh
|
$639
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,070 | $400 |
$3,818
57,842
kWh
|
$1,252
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,039 | $4,600 |
$2,334
35,345
kWh
|
$705
-
kW-mo/yr
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $680 | $127 |
$512
7,765
kWh
|
$168
-
kW-mo/yr
|
- | - | |
06 | 2.8123: Pay utility bills on time | $211 | - | - | - | $211 | - | |
07 | 2.7144: Install spectral reflectors / delamp | $820 | $400 |
$530
8,037
kWh
|
$290
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $435 | $1,138 |
$260
4,885
kWh
|
- | - | $175 | |
TOTAL RECOMMENDED | $26,242 | $44,685 |
$16,276
247,549
kWh
|
$7,289
-
kW-mo/yr
|
$211 | $2,466 | ||
TOTAL IMPLEMENTED | $21,703 | $39,558 |
$12,900
196,402
kWh
|
$6,126
-
kW-mo/yr
|
$211 | $2,466 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs